The next president needs to invest the damn money that’s needed to get this entire thing going. No more deferring. No more dithering. If this turns out to be an impossibility, then we should just privatize the entire production and design process, get rid of the red tape, and just get it DONE before we get delay after delay and then, when we finally DO get there, we find the Chinese have already built a damned settlement.
Scientific Method —
A new, independent review of the Orion spacecraft is pretty damning.
The capsule is over budget and may need seven more years before flying crews.
Read more
Comments are closed.